Track D

Physical

How do Route, Ground and Assure apply where errors have physical consequences?

The same Route, Ground, Assure stack where errors have physical consequences.

Why it matters

Physical trials are planned. Claims will name the testbed stage and report sim-to-real gaps.

Directions

1. D1: Swarm coordination under degraded conditions.

D1: Swarm coordination under degraded conditions.

2. D2: Assurance for learned autonomy (runtime monitors and safety shields).

D2: Assurance for learned autonomy (runtime monitors and safety shields).

3. D3: Language and agents as robot interfaces, with verification gates.

D3: Language and agents as robot interfaces, with verification gates.

4. D4: Assistive robotics with demonstrable safety.

D4: Assistive robotics with demonstrable safety.

This track is described at the program level only. Named projects, hardware catalogues and market claims are withheld until positioning is approved.

Evidence rule: every claim names its testbed stage (simulation, hardware-in-the-loop, controlled indoor, outdoor field) and reports sim-to-real gaps.

Planned paths

  1. D1: Swarm coordination under degraded conditions
  2. D2: Assurance for learned autonomy (runtime monitors and safety shields)
  3. D3: Language and agents as robot interfaces, with verification gates
  4. D4: Assistive robotics with demonstrable safety

Testbed ladder

Four planned stages: simulation, hardware-in-the-loop, controlled indoor, outdoor field. Status comes from the research data file.

  1. 1

    Simulation

    ROS 2, Gazebo

    Planned
  2. 2

    Hardware-in-the-loop

    Flight controller or board with simulated environment

    Planned
  3. 3

    Controlled indoor trials

    Small, safe, repeatable

    Planned
  4. 4

    Outdoor field trials

    Only with permissions and a safety pilot

    Planned

Status: Planned (pattern), In progress (accent border), Done (filled).

View as table
Testbed ladder
StepToolsStatus
SimulationROS 2, GazeboPlanned
Hardware-in-the-loopFlight controller or board with simulated environmentPlanned
Controlled indoor trialsSmall, safe, repeatablePlanned
Outdoor field trialsOnly with permissions and a safety pilotPlanned

Digital stack versus physical stack

Route, Ground and Assure compared in the digital version and the physical version.

LayerDigitalPhysical
RoutePolicy-driven routing across models and providersRouting of planners, agents and comms under degraded conditions
GroundProvenance-first knowledge graph of what the system knowsWorld state and sensor evidence with named sources
AssureQuality contracts before an output shipsRuntime monitors and safety shields before motion
View as table
Digital stack versus physical stack
LayerDigitalPhysical
RoutePolicy-driven routing across models and providersRouting of planners, agents and comms under degraded conditions
GroundProvenance-first knowledge graph of what the system knowsWorld state and sensor evidence with named sources
AssureQuality contracts before an output shipsRuntime monitors and safety shields before motion

Planned metrics

Values show Pending until measurements exist.

Mission completion under injected faults

Pending

Share of missions completed after named faults are injected

Time to re-plan after losing an agent

Pending

Time from agent loss to a revised feasible plan

Unsafe-plan interception rate

Pending

Share of unsafe plans stopped by the monitor before execution

False-block rate

Pending

Share of safe plans blocked by the monitor

Connects to

The lab designs and studies five research objects. They are planned artifacts on the agenda, not products with published measurements.

Work with HOPN Lab

Enterprise buyers, academic collaborators, students and funders in Europe can write to us.